

Structural Problem Solver
The walls for the warehouse are made from concrete blocks. Due to the foundation settlement, the cracks appear on the wall. Reinforcement of the foundation and the walls will be needed.
Solar Panel Installation on Top of a Banff Hotel
Finished a foundation design for a 52 ft span fabric structure using precast concrete blocks.